M
Messer - Hospital Tower Logistics
Albany BotGroup group-hospital-opsAmerica/New_York
Messages4
Translated4
Official3
Constraints2
Failed0
All Messages4 total
| Sender | Priority | Category | Message | Status | Actions |
|---|---|---|---|---|---|
Alyssa Tran project manager | high | constraint | Material stuck at dock. Need inspection release before unload. ES material atascado at muelle. Need inspeccion liberacion before unload. | official | |
Jose Rivera field lead | high | constraint | Concrete crew delayed 45 minutes because the south access route is blocked. ES concreto cuadrilla retrasado 45 minutes because the south acceso ruta is bloqueado. | ||
Dana Brooks safety manager | critical | safety | Safety walk at 1 PM. All crews need PPE at the hoist landing. ES seguridad walk at 1 PM. All crews need PPE at the elevador landing. | official | |
Miguel Santos superintendent | high | logistics | Gate B only after noon. Crane pick moved to 2 PM. ES puerta B solo despues del mediodia. maniobra de grua movido a 2 PM. | official |