Alyssa Tranproject manager11:02 AM
highconstraintofficial
Material stuck at dock. Need inspection release before unload.
ES material atascado at muelle. Need inspeccion liberacion before unload.
Material stuck at dock. Need inspection release before unload.
Concrete crew delayed 45 minutes because the south access route is blocked.
Safety walk at 1 PM. All crews need PPE at the hoist landing.
Gate B only after noon. Crane pick moved to 2 PM.
Material stuck at dock. Need inspection release before unload.
Dock / laydownDetected blocker from live field communication.
Owner: PM + field lead
Concrete crew delayed 45 minutes because the south access route is blocked.
Level 4 coreDetected blocker from live field communication.
Owner: PM + field lead