Messer - Hospital Tower Logistics

Albany BotGroup group-hospital-opsAmerica/New_York
Messages4
Translated4
Official3
Constraints2
Failed0

Live Feed

4 messages
View all
Alyssa Tranproject manager11:02 AM
highconstraintofficial

Material stuck at dock. Need inspection release before unload.

ES material atascado at muelle. Need inspeccion liberacion before unload.
Jose Riverafield lead11:47 AM
highconstraint

Concrete crew delayed 45 minutes because the south access route is blocked.

ES concreto cuadrilla retrasado 45 minutes because the south acceso ruta is bloqueado.
Dana Brookssafety manager12:06 PM
criticalsafetyofficial

Safety walk at 1 PM. All crews need PPE at the hoist landing.

ES seguridad walk at 1 PM. All crews need PPE at the elevador landing.
Miguel Santossuperintendent10:18 AM
highlogisticsofficial

Gate B only after noon. Crane pick moved to 2 PM.

ES puerta B solo despues del mediodia. maniobra de grua movido a 2 PM.

Open Constraints

2
View all

Material stuck at dock. Need inspection release before unload.

Dock / laydown

Detected blocker from live field communication.

Owner: PM + field lead

Concrete crew delayed 45 minutes because the south access route is blocked.

Level 4 core

Detected blocker from live field communication.

Owner: PM + field lead

Job Health

0

Queued

0

Running

0

Failed

Connection

BotAlbany Bot
Group IDgroup-hospital-ops
LanguagesEnglish / Spanish
Trusted rolessuperintendent, project manager, safety manager